Skip to main content
All Ecniv services

Rebar and cages for reinforced-concrete construction

Rebar fabrication and concrete reinforcement

We prepare and assemble reinforcement to supplied drawings. Rebar, stirrups and cages form foundations, columns, ring beams, beams and other reinforced-concrete elements before casting.

Discuss reinforcement work
Rebar cages beside foundation formwork before casting
Illustration of concrete reinforcement preparation.

From drawings to prepared reinforcement

Steel reinforcement,
that becomes part of the structure.

We prepare and tie rebar to project-specified shapes. We review reinforcement drawings, elements and scope, from prefabricated cages to agreed on-site assembly.

Dimensions, composition and location follow the supplied project and construction drawings. We confirm documents, formwork, materials and coordination with the planned pour.

Helpful starting information

  • Project and reinforcement drawings
  • Element list or bill of materials, if available
  • Site location and delivery scope
Describe the construction brief

What the work may include

Reinforcement for individual
reinforced-concrete elements.

Reinforcement is a defined part of the construction process, covering selected elements or several stages. The supplied drawings, quantities and division between preparation and on-site assembly determine the scope.

Foundations and foundation elements

For strip foundations, pads and slabs, we review project reinforcement, cages, drawings and assembly scope, with site readiness and pre-pour coordination.

Columns, ring beams and beams

Rebar and stirrups are assembled to drawings. We agree quantities, layout, handover and, where included, cage installation coordinated with construction and formwork readiness.

Slabs and other cast-in-place elements

Slab, wall and monolithic reinforcement follows the project. We agree work scope, materials, coordination and the specific elements and stages included.

Before the concrete pour

Documents, materials
and construction progress are connected.

For a quotation, provide the building, reinforcement elements, drawings, schedule of reinforcement and construction sequence. For one stage, we define boundaries and connections precisely.

We agree steel supply, access, workspace readiness and dates for preparation, transport and assembly. Drawing changes are reviewed before affected work continues.

How we work together

From reinforcement drawings
to agreed assembly.

The process depends on the building and scope: prefabricating cages differs from reinforcement work during ongoing construction.

  1. 01

    Review the documents

    We identify elements and stages, confirm current drawings, quantities and preparation, and record outstanding questions before quoting.

  2. 02

    Coordinate arrangements

    We establish who supplies, prepares, transports and installs the reinforcement, along with access and site facilities. The delivery scope follows the documents and agreed responsibilities.

  3. 03

    Prepare reinforcement

    Preparation and tying follow the approved brief and supplied dimensions and drawings. Changes are reviewed in advance for the next steps.

  4. 04

    Coordinate with your build

    Delivery or assembly follows site readiness and the construction schedule. We review completed work and coordinate reinforcement with preparation for concreting.

Before our first discussion

Reinforcement questions
and job organisation.

Need cages prepared or reinforcement installed on site? Tell us what drawings you have and your construction stage.

0915 732 867
Are these rebar cages that are subsequently cast in concrete?

Yes. We work with ribbed reinforcing steel bars, commonly called rebar. Bars and stirrups form cages and assemblies to project drawings; preparation and assembly scope is agreed for your build.

Do I need reinforcement drawings, or are dimensions enough?

Basic property details are enough initially. Actual reinforcement dimensions and layout require supplied drawings; we will identify documents needed for a quotation.

Can I order prefabricated reinforcement cages only?

We offer selected prefabricated elements or a wider scope with assembly. Quantities, drawings, materials, handover and any site transport are agreed beforehand.

What affects price and timing?

Price depends on reinforcement complexity, quantities, drawings, preparation, transport and installation, plus construction stages and follow-on dates. The offer covers the agreed job and material supply.

Concrete reinforcement · Ecniv

Discuss reinforcement
of your reinforced-concrete build.

Prepare the project, reinforcement drawings and stage information. Together we define cages, other elements, preparation and assembly scope.

Call EcnivMy enquiry